Our system construction

Most buildings in Europe is cost-too expensive! A huge amount of money being spent on them, and most end up as expensive buildings which are used only for positioning people and assets. Our goal is to help make buildings better and cheaper, thus we believe they do not have to play a major and active role at the meeting about your company's objectives to reduce costs, lower environmental impact, increased occupant productivity and maximize ROI.

We work with clients to achieve the purpose and potential of their valuable building assets by developing buildings with an intelligent vision, policy and strategy, which includes a more modern design and exploitation, by making appropriate use of technology and the imaginative use of intelligent building of the building, we help our clients to make their buildings work better and cheaper.

Building System

Building days

First day after concrete

(1) Steel Structure:

Primary frame: 6-10mm
Secondary frame: galvanized light gauge steel, 2.0-2.5mm

Foundation of our steel parts inserted

3rd day

(2) Foundation  

Steel Elements is set up

7th day

Reinforced concrete foundation
Raft, strip, and independent foundation are all applicable
Standard embedded anchor bolts

(5) Composite Wall System

Steel Elements is set up on the roof

15th day

Wall system: thermal conductivity of the energy-saving composite
wall system (k=0.417W/m2K in summer and k=0.418W/m2K in
winter) is one third of that of conventional wall system.

(6) Roofing System

Floor elements presented

45th day
 